Cleeve Abbey Warming Room

A temporary propping system was designed and installed to support a vaulted concrete slab inside a Grade I listed, medieval monastery. The central supporting column had begun to crack and spall, so the weight of the concrete had to be transferred to ground by alternate means.

Adjustment of the height of each prop was accounted for to level out the slab in the event that there was any settlement of the ground below